Available in 1, 3, 6 and 12 Months Free Updates Plans
PDF: $15 $60

Test Engine: $20 $80

PDF + Engine: $25 $99

CTFL-Foundation Practice Test


Page 2 out of 66 Pages

Topic 1: Scenario 1 "Medical Domain"

You have been given responsibility for the non-functional testing of a safety-critical
monitoring & diagnostics package in the medical area. Which of the following would you
least expect to see addressed in the test plan? 1 credit


A.

Availability


B.

Safety


C.

Portability


D.

Reliability





C.
  

Portability



You are about to release a test progress report to a senior manager, who is not a test
specialist. Which of the following topics should NOT be included in the test progress
report? 1 credit


A.

 Product risks which have been mitigated and those which are outstanding.


B.

Recommendations for taking controlling actions


C.

Status compared against the started exit criteria


D.

Detailed overview of the risk-based test approach being used to ensure the exit criteria
to be achieved





D.
  

Detailed overview of the risk-based test approach being used to ensure the exit criteria
to be achieved



Identify the THREE types of formal peer reviews that can be recognized. 1 credit


A.

Inspection


B.

Management review


C.

Walkthrough


D.

Audit


E.

Technical review


F.

Informal review


G.

Assessment





A.
  

Inspection



C.
  

Walkthrough



E.
  

Technical review



Which of the following is an example of testing as part of the requirements specification
phase? 1 credit


A.

A requirements review meeting


B.

A business analyst eliciting requirements


C.

Performing acceptance tests against requirements


D.

A test report showing requirements coverage





A.
  

A requirements review meeting



IEEE 1028 also defines “management review” as a type of review. What is the main
purpose of a management review? 1 credit


A.

Align technical concepts during the design phase


B.

Establish a common understanding of requirements


C.

Provide independent evaluation of compliance to processes, regulations, standards etc.


D.

To monitor progress, assess the status of a project, and make decisions about future
actions





D.
  

To monitor progress, assess the status of a project, and make decisions about future
actions




Page 2 out of 66 Pages
Previous