Christmas Dumps Discount
Home / Blue Prism / Solution Designer / ASD01 - Designing Blue Prism Process Solutions (EN)

Blue Prism ASD01 Test Dumps

Total Questions Answers: 27
Last Updated: 16-Dec-2024
Available with 1, 3, 6 and 12 Months Free Updates Plans
PDF: $15 $60

Test Engine: $20 $80

PDF + Engine: $25 $99

Check Our Recently Added ASD01 Practice Exam Questions


Question # 1



The status of a Work Queue can be used as a method of recording what work has been done so far on a Work
Queue item
Please consider the following statements:
1. For Ml, to easily see how far an item has been worked
2 To aid manual working of exceptions, providing the Item Status can inform staff what work is still
outstanding on an item that needs manually completing
3. To enable Work Queue items to be safely retried, a process can use the item status to know which updates
have already been performed so that they are not repeated
4 To record the Customer's Surname
Which of the statements are valid reasons for updating a case status?

A.

2 only

B.

2 and 3 only

C.

1, 2 and 3

D.

1 ,2, 3 and 4




C.
  

1, 2 and 3







Question # 2



ProSafe credil reference agency retrieves data from bank and other credit providers where customers have
missed payments or gone into default. The data is very sensitive and fed directly into a Blue Prism work queue
via a web service. Blue Prism process must process the data within 4 hours. The Blue Prism solution runs
continuously and each case takes approximately 30 seconds to process. It is expected that an average of 10,000
cases per day will be required and up to 10 Blue Prism robots are available. The Blue Prism solution is shown
below:

For each case the process will access the customer account in the HotRisk system and, where an account
exists, harvest the data which will be fed along with the Work Queue data into a rules engine. The rules engine
is a Blue Prism process that does not interact with any target system. It merely consumes data and. via a
complicated series of decision and choice stages, determines the new customer risk factor.
There is to be no scheduler used. Instead the Process Controllers who work in shifts to provide 24 hour support
will stop and start process instances in line with Work Queue volumes.
As a Blue Prism process solution designer, who is reviewing the solution, which of the following would
concern you? (select 3 responses)

A.

The solution is not scalable.

B.

The process does not have an end stage

C.

The rules engine has been built in a process not an object.

D.

The process opens and closes the HotRisk system for each case

E.

The data is too sensitive for automated processing.




A.
  

The solution is not scalable.




B.
  

The process does not have an end stage









Question # 3



The following Object Design has been created for a mainframe banking application

Which of the following statements about the Object design above are correct? (select 2 responses)

A.

The Add Note action in the "BankHost - Notepad" business object does not require an input for Type as
the process definition document states that Information' will always be selected for this process.

B.

The object design facilitates a scalable design that will reduce the impact of change when the object
layer needs altering

C.

The object design should be simplified by storing all BankHost actions in the same object

D.

There is no need for attach actions to be replicated across all the objects.

E.

The design complies with Blue Prism design best practice.




B.
  

The object design facilitates a scalable design that will reduce the impact of change when the object
layer needs altering




E.
  

The design complies with Blue Prism design best practice.







Question # 4



A process is required for a client in the banking sector that involves using an application to transfer funds
between accounts A strong security model is in place to prevent any malicious activity but the client is nervous
about the risk of external problems, like a power cut leaving a case in an incomplete state or a fault in the
source data causing a case to be duplicated or an excessively large transfer to be made.
What should be included in the solution design? (select 3 responses)

A.

A different queue for each major processing step

B.

A different process for each major processing step.

C.

A single queue that is cleared of all worked items at the start of each day.

D.

Rules to limit transaction values.

E.

A key value that will uniquely identify queue items.




A.
  

A different queue for each major processing step




E.
  

A key value that will uniquely identify queue items.









Question # 5



Imagine you are designing the application integration logic for a solution. One of the applications involved is
one you have not automated before but it is widely used and the project is the first in a series for this client. Which of the following are valid considerations when designing business objects? (select 2 responses)

A.

It's best that objects are designed to be reusable and are not made bespoke for one process.

B.

The first Production process to automate an application should not share its integration logic with any
other because there will invariably be teething problems during an initial implementation.

C.

When an application is automated for the first time a single business object should be used to isolate the
first process from any that follow.

D.

Any new application should be assessed to find the appropriate integration technique and identify any
potential technical issues.

E.

It's best that each process uses its own business objects to keep it separate from any other.




A.
  

It's best that objects are designed to be reusable and are not made bespoke for one process.




D.
  

Any new application should be assessed to find the appropriate integration technique and identify any
potential technical issues.







Question # 6



Consider the following high-level design:

The application concerned is prone to being sluggish or even unresponsive at times. As the solution designer
you should anticipate that there will be system exceptions and that after an exception case the application
might not be in arNdea1 state. What should you do? (select 3 responses).

A.

Add clean up' logic to get the application in the right position after Apply Queue Item Result.

B.

Kill the application after each case and log back in to ensure the next case starts in the right position

C.

Instruct the developers to build objects capable of navigating the application back to the home position.

D.

Restart the application if attempts to navigate back to the home position fail

E.

Move Log into Application to be before Work Stepl1 and move Log Out of Application to be after
Step3.




A.
  

Add clean up' logic to get the application in the right position after Apply Queue Item Result.




C.
  

Instruct the developers to build objects capable of navigating the application back to the home position.




D.
  

Restart the application if attempts to navigate back to the home position fail







Question # 7



A process definition document has been produced for a process that interfaces with two applications FirstApp
and Customer Information (CI) The
process requirement is to perform data extraction from FirstApp before performing a number of steps in the CI
application.
It is estimated that to perform the daily case volume within SLA's will require 10 robots Average license time
is approximately 10 minutes, with the
FirstApp steps requiring only 1 minute to perform.
The client has a limited number of licences for the FirstApp application and is reluctant to use 10 of these
licenses to automate the process.
Which of the below is a valid design option for the project?

A.

Automate the end to end process using two Blue Prism processes. Process 1 will perform the FirstApp
tasks. Process 2 will perform the CI tasks Data will be passed from Process 1 to Process 2 via a Blue
Prism Work Queue Process 1 will run on a single robot, with Process 2 running on 9 robots.

B.

Automate the end to end process using two Blue Prism processes Process 1 will perform the FirstApp
tasks. Process 2 will perform the CI tasks. Data will be passed from Process 1 to Process 2 via a
spreadsheet. Process 1 will run on a single robot, with Process 2 running on 9 robots.

C.

Automate the end to end process using a single Blue Prism process which will only be run on a single
robot

D.

Automate the end to end process using a single Blue Prism process which will be run on 10 robots




A.
  

Automate the end to end process using two Blue Prism processes. Process 1 will perform the FirstApp
tasks. Process 2 will perform the CI tasks Data will be passed from Process 1 to Process 2 via a Blue
Prism Work Queue Process 1 will run on a single robot, with Process 2 running on 9 robots.







Question # 8



When designing business objects which of the following statements is true? (select 3 responses)?

A.

It's best practice to keep application logic in one business object so that there is a single point of
reference.

B.

It's good practice to split application logic into multiple objects so that the process is more efficient.

C.

It's good practice to keep application logic in one business object so that developers know where to find
it.

D.

It's good practice to keep application logic in one business object to minimise the process dependencies.

E.

It's good practice to split application logic into multiple objects to minimise the process dependencies.




B.
  

It's good practice to split application logic into multiple objects so that the process is more efficient.




E.
  

It's good practice to split application logic into multiple objects to minimise the process dependencies.









Question # 9



Consider the following steps for a theoretical manual process
• Check in input folder for any new files.
• If there are no files check again later as files can arrive anytime, and there is no limit to the number of files
that may come
• Open the next available file.
• Take the first case
• Start System X and find the case details.
• If the case can't be found., move to the next one.
• After finding the case in System X. fetch additional case details from System Y.
• Again if the case can't be found, move to the next one.
• Analyse all the data to see if System Z should be updated
• If the data does not meet the requirements, add notes indicating this to Systems X and Y and move to the
next case
• If the data does meet the requirements, update the case in System Z
• Add notes to Systems X and Y and move to the next case.
• At the end of the file, go back and look for another
• Stop checking for new files at 16:00 and finish any remaining cases.
• When all work is complete create a report of the day's exception cases.
• Close down Systems X, Y and Z.
If it is imperative that notes are applied to System X and Y, regardless of whether System 2 is updated or not,
what could the process do? (select 2 responses)

A.

Add all notes before attempting to update System 2

B.

Create an unhappy path where notes are added as part of exception handling.

C.

Add notes before rejecting a case as a Business Exception.

D.

Create new cases for any cases not found in Systems X and Y so that notes can be added.




B.
  

Create an unhappy path where notes are added as part of exception handling.




C.
  

Add notes before rejecting a case as a Business Exception.







Question # 10



A proposed Blue Prism solution with the following properties has been created to automate the payment
processing:
• There will be one Blue Prism process that will perform the steps described above.
• Where a case is an exception the status will be set in Paytex to "Manual Review" in order that the manual
team can pick up the case from Paytex and contact the customer and conclude the case.
• It is anticipated that to meet the SLAs of the expected volumes up to 5 instances of the Blue Prism process
will be required to run concurrently.
• A Blue Prism work queue will be used to host the payments. The queue will be configured for only 1 attempt
per case and the key will be {region} & {source account number}.
• The process will be started by the scheduler at 06:00 and will stop at 05:50

Which of the following are correct? (select 3 responses).
There is a risk that a payment can be duplicated.

A.


There is a risk that a payment can be duplicated.

B.

The process should not be designed to use a Blue Prism Work Queue but use Paytex as the work queue.

C.

The process will not scale i.e. you cannot run multiple instances at the same time

D.

The solution exposes sensitive personal information

E.

The process should not be automated as it uses a third party web application.




B.
  

The process should not be designed to use a Blue Prism Work Queue but use Paytex as the work queue.




C.
  

The process will not scale i.e. you cannot run multiple instances at the same time




D.
  

The solution exposes sensitive personal information






Get 27 Designing Blue Prism Process Solutions (EN) questions Access in less then $0.12 per day.

Blue Prism Bundle 1:


1 Month PDF Access For All Blue Prism Exams with Updates
$100

$400

Buy Bundle 1

Blue Prism Bundle 2:


3 Months PDF Access For All Blue Prism Exams with Updates
$200

$800

Buy Bundle 2

Blue Prism Bundle 3:


6 Months PDF Access For All Blue Prism Exams with Updates
$300

$1200

Buy Bundle 3

Blue Prism Bundle 4:


12 Months PDF Access For All Blue Prism Exams with Updates
$400

$1600

Buy Bundle 4
Disclaimer: Fair Usage Policy - Daily 5 Downloads

Designing Blue Prism Process Solutions (EN) Exam Dumps


Exam Code: ASD01
Exam Name: Designing Blue Prism Process Solutions (EN)

  • 90 Days Free Updates
  • Blue Prism Experts Verified Answers
  • Printable PDF File Format
  • ASD01 Exam Passing Assurance

Get 100% Real ASD01 Exam Dumps With Verified Answers As Seen in the Real Exam. Designing Blue Prism Process Solutions (EN) Exam Questions are Updated Frequently and Reviewed by Industry TOP Experts for Passing Solution Designer Exam Quickly and Hassle Free.

Blue Prism ASD01 Test Dumps


Struggling with Designing Blue Prism Process Solutions (EN) preparation? Get the edge you need! Our carefully created ASD01 test dumps give you the confidence to pass the exam. We offer:

1. Up-to-date Solution Designer practice questions: Stay current with the latest exam content.
2. PDF and test engine formats: Choose the study tools that work best for you.
3. Realistic Blue Prism ASD01 practice exam: Simulate the real exam experience and boost your readiness.

Pass your Solution Designer exam with ease. Try our study materials today!

Official Blue Prism Solution Designer exam info is available on Blue Prism website at https://university.blueprism.com/certification/solution-designer

Prepare your Solution Designer exam with confidence!

We provide top-quality ASD01 exam dumps materials that are:

1. Accurate and up-to-date: Reflect the latest Blue Prism exam changes and ensure you are studying the right content.
2. Comprehensive Cover all exam topics so you do not need to rely on multiple sources.
3. Convenient formats: Choose between PDF files and online Designing Blue Prism Process Solutions (EN) practice questions for easy studying on any device.

Do not waste time on unreliable ASD01 practice test. Choose our proven Solution Designer study materials and pass with flying colors. Try Dumps4free Designing Blue Prism Process Solutions (EN) 2024 material today!

Solution Designer Exams
  • Assurance

    Designing Blue Prism Process Solutions (EN) practice exam has been updated to reflect the most recent questions from the Blue Prism ASD01 Exam.

  • Demo

    Try before you buy! Get a free demo of our Solution Designer exam dumps and see the quality for yourself. Need help? Chat with our support team.

  • Validity

    Our Blue Prism ASD01 PDF contains expert-verified questions and answers, ensuring you're studying the most accurate and relevant material.

  • Success

    Achieve ASD01 success! Our Designing Blue Prism Process Solutions (EN) exam questions give you the preparation edge.

If you have any question then contact our customer support at live chat or email us at support@dumps4free.com.