You need to configure the bicycles’ production resource. Which option should you use?
A. Exclusive capacity set to yes and enter a Batch capacity.
B. Exclusive capacity set to no and infinite capacity.
C. Exclusive capacity set to yes and infinite capacity.
D. Exclusive capacity set to no and enter a Batch capacity.
Explanation:
Reference: [Reference:, https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/operations-resources, , ]
You need to configure lot number control for inventory. Which option should you use?
A. Physical inventory
B. Blank receipt allowed
C. Blank issue allowed
D. Primary socking
You need to plan scheduling for Customer1’s order of unscented solution. What are two possible ways to achieve the goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
A. Schedule production based on the availability of raw material.
B. Split and plan operations in detail for each of the resources.
C. Schedule productions based on the capacity of the resources.
D. Run master planning with a specific time fence.
E. Plan scheduling of the production at the resource group level.
You need to enable the features and configuration keys for the firepits. Which two features should you enable? Each answer presents part of the solution. NOTE: Each correct selection is worth one point
A. Engineering attributes
B. Change management for process manufacturing
C. Engineering product variants
D. Engineering change management
E. Production floor execution management
You need to determine the sales price for a new limited-edition bicycle for the summer season. What should you do?
A. Run inventory close for the BOM items for the limited-edition bicycle.
B. Create the production order for the limited-edition bicycle and click estimate.
C. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
D. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
Page 1 out of 6 Pages |