You need to configure the system to meet the inventory team cost control requirement.
Which processes should you run? To answer, drag the appropriate processes to the
correct requirements. Each process may be used once, more than once, or not at all. You
may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.






D18912E1457D5D1DDCBD40AB3BF70D5D
You need to configure the system to support the inventory costing requirement.
Which two actions should you perform? Each answer represents a complete solution.
NOTE: Each correct selection is worth one point.


A.

one default item group for all items


B.

one item group each for perfume, ceramicware, and other goods


C.

one FIFO item model group and one Standard item model group


D.

one FIFO item group


E.

one financial dimension for each item group





B.
  

one item group each for perfume, ceramicware, and other goods



C.
  

one FIFO item model group and one Standard item model group



You need to configure the system to support the pottery line.
What should you do first?


A.

Set up a new product with product configuration.


B.

Create a new product with tracking dimensions.


C.

Create a new product master with pre-defined product variants.


D.

Create a new product with storage dimensions





C.
  

Create a new product master with pre-defined product variants.



Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/tasks/create-predefinedproduct-
variants

You need to configure the inventory reports.
Which configuration settings should you use? To answer, select the appropriate options in
the answer area. NOTE: Each correct selection is worth one point






You need to configure the structure for the new line of perfumes.
What should you do first?


A.

Create a procurement category hierarchy.


B.

Create a new product with racking dimensions.


C.

Create a new product with storage dimensions.


D.

Create product configurations.


E.

Set up a new product master and implement serial tracking.





E.
  

Set up a new product master and implement serial tracking.