Topic 1, Exam Set A
In WDS point-to-multipoint mode, how many Leaf APs can I connect to a single Root AP?
A.
2
B.
4
C.
6
D.
8
6
From the perspective of signal coverage, roaming reliability depends on the planning of the overlay overlapping area.
A.
True
B.
False
True
The following is true about the AP installation location?
A.
For aesthetic needs, priority can be given to placing the AP on the ceiling.
B.
If the site is a monolithic ceiling, the AP should be considered as close to the maintenance port.
C.
The material of the ceiling is generally thin, and the impact on the cover is negligible.
D.
When wall-mounting or installing under the ceiling, it may be necessary to punch holes. When surveying, try to confirm with the property whether it is feasible.
For aesthetic needs, priority can be given to placing the AP on the ceiling.
If the site is a monolithic ceiling, the AP should be considered as close to the maintenance port.
When wall-mounting or installing under the ceiling, it may be necessary to punch holes. When surveying, try to confirm with the property whether it is feasible.
Basic requirements for WLAN network construction include bandwidth requirements, coverage targets, coverage methods, field strength requirements, and power distribution methods. Determining the strength of the coverage area in the field strength requirement is adjusted by the AP transmit power. The following statements are correct regarding the requirements that the network regulation needs to consider in advance. Is it?
A.
The field strength demand in key areas is that the main online area of the user can be controlled at -40~-80dBm. If the power is too strong, it will easily lead to receiving overload, and the power is too weak. Will cause the connection rate to drop
B.
The interference field strength requirement is that the same-frequency interference in the same area is not more than -80dBm
C.
The fringe field strength level combined with the receiving sensitivity and edge bandwidth requirements are generally selected above -75dBm
D.
The leakage field strength of the system should not be too large, and the field strength at 10m of the external network of the building cannot be greater than -90dBm.
The interference field strength requirement is that the same-frequency interference in the same area is not more than -80dBm
The fringe field strength level combined with the receiving sensitivity and edge bandwidth requirements are generally selected above -75dBm
The leakage field strength of the system should not be too large, and the field strength at 10m of the external network of the building cannot be greater than -90dBm.
Which of the following is true about the WLAN Survey Pad tooling method?
A.
Supporting finger operations during the process of drawing obstacles, moving the scaled drawings to find the best position to draw obstacles, does not support increasing obstacle types
B.
The industrial survey tools and planning tools need to be used together. First, get the drawings, first use the planning tools to make a simple plan for the project, and then take the Pad to the present. Work on the site, then export the project and import it into the planning tool for further planning.
C.
Create a new project, select the floor node, see the corresponding building thumbnail in the preview box on the right, click on the thumbnail to enter the selected floor to supplement the survey information.
D.
Pad's industrial survey tools and planning tools are suitable for pre-sales network regulations, and WLAN test tools are used for post-production verification before delivery.
The industrial survey tools and planning tools need to be used together. First, get the drawings, first use the planning tools to make a simple plan for the project, and then take the Pad to the present. Work on the site, then export the project and import it into the planning tool for further planning.
Create a new project, select the floor node, see the corresponding building thumbnail in the preview box on the right, click on the thumbnail to enter the selected floor to supplement the survey information.
Pad's industrial survey tools and planning tools are suitable for pre-sales network regulations, and WLAN test tools are used for post-production verification before delivery.
Page 15 out of 56 Pages |
Previous |