Go Back on CAPM Exam
Available in 1, 3, 6 and 12 Months Free Updates Plans
PDF: $15 $60

Test Engine: $20 $80

PDF + Engine: $25 $99

CAPM Practice Test


Page 5 out of 157 Pages

Topic 1, Volume A

A project manager providing information to the right audience, in the right format, at the right time
is an example of which type of communication?


A.

Efficient


B.

Effective


C.

Push


D.

Pull





B.
  

Effective



Scope, schedule, and cost parameters are integrated in the:


A.

Performance measurement baseline


B.

Analysis of project forecasts,


C.

Summary of changes approved in a period,


D.

Analysis of past performance.





A.
  

Performance measurement baseline



A project in which the scope, time, and cost of delivery are determined as early as possible is
following a life cycle that is:


A.

Adaptive


B.

Predictive


C.

Incremental


D.

 Iterative





B.
  

Predictive



What is the schedule performance index (SPI) if the planned value (PV) is $100, the actual cost
(AC) is $150, and the earned value (EV) is $50?


A.

0.50


B.

0.67


C.

1.50


D.

2.00





A.
  

0.50



Which item is an input to the Define Activities process?


A.

Schedule data


B.

Activity list


C.

Risk register


D.

Scope baseline





D.
  

Scope baseline




Page 5 out of 157 Pages
Previous